Systems planned with new construction
Choosing the rain system before boards are installed can simplify integration with joists, posts and the house connection. Review the manufacturer instructions and account for drainage slope, troughs or panels, seals and collection points. The framing and finished deck still need their own suitable design. Identify interfaces around penetrations and the house before installation begins. Specify how water reaches collection points and how the system can be cleaned, rather than leaving those details until after the lower ceiling is finished.


